Executive Summary

This report presents a strategic roadmap for the establishment of a vertically integrated, sovereign Sodium-Ion (Na-ion) battery manufacturing industry in Australia. It posits that the Federal Government's National Energy Network (NEN) policy, with its massive and certain demand for grid storage, provides a unique, time-limited opportunity to underwrite the creation of this critical national capability. This initiative is not merely an ancillary component of the NEN but a foundational pillar of the Future Made in Australia policy, designed to transform a significant national supply chain vulnerability into a formidable economic and strategic asset.1

The core of this strategy is an aggressive, high-growth industrial plan built on a decentralized "virtual gigafactory" model. Instead of a conservative, sequential build-out, this roadmap calls for the rapid and overlapping construction of multiple manufacturing clusters across Australia. This approach fully utilizes the manufacturing component of the NEN Infrastructure Trust Fund (ITF) from the beginning to establish a dominant domestic production capacity that not only meets the NEN's needs but is explicitly designed for strategic grid expansion and large-scale exports from its inception.1

Phase I (2026-2032) leverages the NEN's foundational demand of 500 GWh to de-risk the establishment of the first two "virtual gigafactory" clusters, with construction commencing in an overlapping timeline to accelerate capacity growth.1

Phase II (2033-2040) scales this capability to achieve national market leadership and establish a significant export footprint. This phase transitions to a continuous production model that manufactures a strategic surplus of NEN Nodes and standalone battery systems for both domestic grid augmentation and international markets.2

Phase III (2041-2050) positions Australia as a global export powerhouse, expanding the distributed network to meet surging international demand for secure, high-quality energy storage solutions, particularly in the Asia-Pacific.3

The financial architecture of this initiative is designed for a clear and deliberate transition from public incubation to private-sector-driven growth. A state-owned NEN Commercial Arm will be established to orchestrate this network, supplying the core NEN utility on a transparent, at-cost basis.1 The NEN ITF, in synergy with the Future Made in Australia (FMIA) policy, will provide the initial capital and R&D funding.1 The analysis projects that with this aggressive investment, the enterprise will achieve financial self-sufficiency by approximately 2038, after which its significant and growing commercial and export revenues will fund all future growth.

Key recommendations include the immediate legislative establishment of the NEN Commercial Arm, the formalization of the NEN ITF's role as a strategic incubator, and the adoption of an aggressive, overlapping "virtual gigafactory" construction schedule. By executing this strategy, Australia can secure its own energy future, add significant value to its abundant natural resources, create thousands of skilled manufacturing jobs across multiple regions, and build a multi-billion-dollar export industry that enhances both national prosperity and regional stability.

Section 1: The NEN as Industrial Catalyst: Securing the Domestic Foundation (2026-2032)

The National Energy Network (NEN) represents more than a transformative energy policy; it is the most significant industrial catalyst in a generation. Its scale and structure provide the foundational demand certainty required to overcome the historical barriers to establishing a sovereign advanced manufacturing capability in Australia. This section quantifies this foundational demand and outlines a pragmatic strategy to leverage it, transforming a project-level requirement into the cornerstone of a new national industry.

1.1. Quantifying Foundational Demand: The 500 GWh Anchor

The NEN implementation plan calls for the deployment of 50,000 community-level battery storage systems, or "NEN Nodes," to stabilize the world's largest distributed power station.1 Each of these nodes is specified with a 10 MWh capacity, creating a total, non-negotiable foundational demand of 500 GWh.1

Critically, the NEN policy explicitly nominates Sodium-Ion (Na-ion) as the preferred battery chemistry for this task.1 This is a deliberate strategic choice. Na-ion batteries utilize earth-abundant and inexpensive raw materials—primarily sodium, iron, and aluminium—all of which Australia possesses in vast quantities.1 This chemistry avoids the use of cobalt and can leverage aluminium current collectors instead of copper, further reducing costs and environmental concerns.1 Most importantly, it circumvents the volatile and geopolitically concentrated supply chains of lithium, nickel, and cobalt, which are increasingly subject to trade tensions and strategic competition.1

This 500 GWh demand is the single most valuable element in de-risking the establishment of a domestic manufacturing industry. It functions as a guaranteed, government-backed, multi-year offtake agreement. For potential public and private investors, this removes the primary market uncertainty that has historically stifled capital-intensive industrial projects in Australia.1 It solves the classic "chicken-and-egg" problem: private capital has been unwilling to build factories without guaranteed buyers, and large buyers have been unable to source locally without existing factories. The NEN's demand provides the scale and certainty needed to underwrite the multi-billion-dollar capital expenditure required for a gigafactory, creating a secure market for its initial years of operation.1

1.2. The NEN Industrial Strategy: Leveraging the "Transformer Delay"

A critical-path analysis of the NEN rollout reveals a key logistical dependency that, when viewed through an industrial strategy lens, becomes a significant strategic asset. The mass deployment of NEN Nodes is contingent not on the supply of batteries, but on the delivery of 50,000 new and upgraded distribution transformers. These are complex, long-lead-time items, with global supply chains dictating a delivery schedule of between 1.5 and 4 years from the placement of binding orders.1

Assuming the NEN project is legislated and initial orders are placed in 2026, mass deliveries of transformers cannot be expected to arrive in Australia until late 2027 at the earliest, with the installation rate only reaching peak scale in 2028-2029.1 This creates a de-facto 2-3 year window at the commencement of the project where mass battery deployment is logistically impossible.

This "transformer delay" aligns perfectly with the NEN's proposed two-pronged industrial ramp-up strategy.1 This strategy involves:

The alignment of these timelines provides a clear strategic path. The objective for Australia's nascent battery industry is not to immediately compete with the immense scale and low costs of established Chinese manufacturers. Instead, the initial objective is to establish a sovereign production line that can come online before the bulk of the NEN's 500 GWh battery demand materializes. The race is not against the price of an imported battery in 2026, but against the delivery schedule of the transformers arriving in 2028.

This reframes the entire industrial proposition. It allows the NEN to source its first tranches of batteries from a domestic facility, immediately enhancing supply chain resilience, capturing economic value locally, and building a skilled workforce. This strategic advantage justifies a potential initial cost premium for these domestically produced units and ensures the sovereign manufacturing initiative is viable from its inception.

1.3. Initial Production Plan: The "Virtual Gigafactory" Model

To execute this strategy, the NEN will adopt a "virtual gigafactory" model, also known as a distributed manufacturing network. Instead of concentrating all production in a single, monolithic mega-factory, this model establishes a network of specialized, medium-sized factories, often by retrofitting existing "brownfield" sites.1 This approach is strategically superior for a national project like the NEN for several key reasons:

The initial plan involves establishing NEN Node Manufacturing Cluster 1, likely in an established industrial region with a skilled workforce, such as the Geelong/Melbourne corridor in Victoria or the Elizabeth/Adelaide corridor in South Australia.1 This cluster would consist of several specialized, retrofitted plants for battery material processing, cell manufacturing, and final NEN Node assembly. This first cluster would be scheduled to come online in 2028, aligning with the arrival of the first mass shipments of NEN transformers.

Section 2: The National & Global Opportunity: Sizing the Total Addressable Market

While the NEN provides the critical launch platform, the long-term viability and ultimate scale of Australia's sovereign battery industry depend on the total addressable market beyond this initial project. A comprehensive analysis of both domestic and international demand reveals an opportunity far exceeding the NEN's internal requirements, providing a clear and quantifiable growth pathway for decades to come.

2.1. The Domestic Grid-Scale Market: Beyond the NEN

The definitive forecast for Australia's long-term energy storage needs is provided by the Australian Energy Market Operator's (AEMO) 2024 Integrated System Plan (ISP). The ISP's "Step Change" scenario, which AEMO and industry stakeholders consider the most likely future, projects a staggering growth in the requirement for firming capacity to support a grid dominated by renewable energy.23

According to the 2024 ISP, the National Electricity Market (NEM) will require a total of 660 GWh of storage capacity by 2050.2 This demonstrates that the NEN's 500 GWh demand, while transformative, represents the first major tranche of a much larger, sustained domestic procurement cycle that will last for over two decades. The concept of "evergreen demand" outlined in the NEN policy—whereby components are replaced and upgraded over time—is dwarfed by the sheer scale of new capacity required by the broader grid transition.1

The following table contextualizes this opportunity by contrasting the NEN's cumulative demand against the total projected need for grid-scale battery storage in the NEM.

Year Total NEM Grid-Scale Storage Demand (GWh) NEN Cumulative Demand (GWh) Remaining Addressable Domestic Market (GWh)
2030 ~100 ~150 -
2035 522 500 22
2040 ~580 500 80
2045 ~620 500 120
2050 646 500 146

Source: Derived from AEMO 2024 ISP data and NEN Policy Proposal.1 Note: NEM demand figures are interpolated from ISP projections. NEN demand is assumed to be front-loaded in the early 2030s.

This analysis clearly shows that upon completion of the NEN rollout around 2034, a substantial and growing domestic market for grid-scale batteries will exist. This provides a secure, long-term revenue stream for the NEN Commercial Arm, ensuring that manufacturing capacity does not become redundant post-NEN.

2.2. The Global Export Prize: Targeting the Asia-Pacific

The global market for Na-ion batteries is forecast to expand rapidly, driven by the same needs for cost-effective, secure energy storage that underpin the Australian case. Market analysis projects global Na-ion demand will grow from approximately 4 GWh in 2024 to over 90 GWh by 2035, with some forecasts suggesting the market could exceed $30 billion by 2036.27

The epicentre of this growth is the Asia-Pacific (APAC) region, which is projected to be both the largest and fastest-growing market.1 Nations like China and India are aggressively expanding their renewable energy capacity and require vast amounts of storage to ensure grid stability.1 While China currently dominates global battery manufacturing, its production is largely absorbed by its enormous domestic demand for electric vehicles and grid projects.1 This creates a strategic opening for a politically stable, high-quality, and reliable secondary supplier to the region.

Australia is uniquely positioned to fill this role. Many nations in the APAC region, including key strategic and trading partners like Japan, South Korea, and Vietnam, are actively seeking to diversify their clean energy supply chains to reduce their dependence on a single country.1 An Australian-made NEN Node, backed by a secure supply of domestic raw materials and manufactured to high quality and environmental standards, represents a highly attractive proposition for these markets.

2.3. Australia's Competitive Position: A SWOT Analysis

A clear-eyed assessment of Australia's competitive position reveals a compelling, albeit challenging, opportunity.

Section 3: An Aggressive Sovereign Manufacturing Roadmap (2026-2050)

To achieve the ambition of becoming a global leader, a more aggressive, front-loaded industrial strategy is required. This revised roadmap utilizes the full capacity of the NEN ITF's manufacturing fund to accelerate the construction of multiple "virtual gigafactory" clusters in an overlapping timeline. This approach aims to establish a dominant domestic production capacity early, positioning the NEN Commercial Arm to capture both domestic and export markets from the moment the initial NEN rollout is complete.

3.1. The Continuous Production Strategy: Beyond the Initial 50,000 Nodes

This aggressive strategy moves beyond viewing the NEN as a one-off project. The manufacturing capability is established as a permanent national asset, designed for continuous production from day one. After fulfilling the initial 50,000 NEN Node order, the manufacturing clusters will immediately pivot to serve three core markets simultaneously:

The following table provides a high-level forecast for this post-NEN production strategy.

Table 3.1: Aggressive Production and Market Strategy (2035-2050)

Year Total Annual Production (GWh) NEN Evergreen Replacement (GWh) Domestic Strategic Reserve (GWh) Domestic Commercial Sales (GWh) Export Sales (GWh)
2035 60 10 15 20 15
2040 80 15 15 15 35
2045 100 20 15 15 50
2050 120 20 10 10 80

Note: Figures are illustrative projections based on an aggressive, overlapping factory build-out and a strategic focus on capturing significant export market share.

3.2. National Grid Storage Capacity Growth

The continuous production model, particularly the allocation of a portion of output to a "Domestic Strategic Reserve," will systematically increase Australia's total grid storage capacity, enhancing national energy security far beyond the initial NEN project.

Table 3.2: Projected Growth of National Grid Storage Capacity (2034-2050)

Year NEN Baseline Storage (GWh) Annual Strategic Reserve Addition (GWh) Cumulative National Storage Capacity (GWh)
2034 500 0 500
2035 500 15 515
2036 500 15 530
2037 500 15 545
2038 500 15 560
2039 500 15 575
2040 500 15 590
2045 500 15 (avg) 665
2050 500 10 (avg) 725

Note: This model demonstrates how continuous production post-2034 builds a strategic energy reserve, surpassing the AEMO 2050 forecast of 646 GWh and creating a more resilient national grid.2

3.3. Detailed Phase Descriptions

Phase I (2026-2032): Aggressive Foundation & Overlapping Construction

The objective of this phase is to use the full weight of the NEN ITF's manufacturing fund to build an overwhelming domestic production capacity as quickly as possible.

Action: An aggressive, overlapping construction schedule will be initiated.

Result: By the end of this phase in 2032, Australia will have three manufacturing clusters at various stages of completion, with a target national production capacity of 40 GWh per year.

Key Actions: In addition to construction, this phase will involve securing technology licensing, launching a scaled-up national workforce training program, and establishing the national battery recycling scheme.1

Phase II (2033-2037): Achieving National Dominance & Export Leadership

With the NEN rollout nearing completion, the objective of Phase II is to leverage the now-massive domestic production capacity to dominate the Australian market and become a major regional exporter.

Action: Complete the construction and ramp-up of all three manufacturing clusters.

Result: By 2037, total national production capacity will reach 80 GWh per year.

Market Focus: The NEN Commercial Arm will secure the majority of the non-NEN domestic grid storage market forecast by AEMO and aggressively expand its export operations into the Asia-Pacific, leveraging its scale and geopolitical stability to compete with established players.38

R&D: Supported by dedicated R&D funding from the NEN ITF, this phase will focus on developing next-generation Na-ion cells and integrated NEN Node solutions to maintain a technological edge.1

Phase III (2038-2050): Global Powerhouse Status

The final phase of this roadmap aims to solidify Australia's position as a top-tier global supplier of Na-ion batteries and integrated smart grid systems.

Action: Focus on optimizing the efficiency of the existing 80 GWh network and making targeted investments in further expansion funded by commercial revenue.

Result: Production capacity will be progressively expanded to 120 GWh per year by 2050, driven primarily by export demand.

Market Focus: The primary target will be major energy-importing nations in the APAC region and other allied nations seeking to diversify their energy technology supply chains.1

IPO: A potential IPO of the NEN Commercial Arm remains a key strategic option in this phase to fund further global expansion and return value to the Australian public.1

Section 4: The Business Case: A Path to Financial Self-Sufficiency

A credible industrial strategy requires an equally credible business case. This section details the financial architecture designed to launch, scale, and sustain Australia's sovereign NEN Node manufacturing initiative. It outlines a hybrid public-private structure, presents a detailed cost model for the distributed manufacturing network, and provides a clear financial forecast demonstrating a definitive path to self-sufficiency.

4.1. Structuring the NEN Commercial Arm: The Public-Private Hybrid

The NEN proposal outlines the creation of a separate Commercial Arm to leverage the project's assets and surplus energy.1 However, the policy is silent on the critical issue of the pricing relationship between this commercial entity and the core NEN public utility it must supply.1 This creates a fundamental conflict: the NEN utility, as a public good project, must procure components at the lowest possible cost, while the Commercial Arm must generate profit to be attractive to the private capital needed for its long-term expansion.

To resolve this, a carefully designed hybrid model is proposed. In its initial phases, the NEN Commercial Arm will be established as a wholly state-owned enterprise. Its financial relationship with the core NEN utility will be governed by two clear principles:

This structure elegantly solves the inherent conflict. It allows the public utility to receive its components at the lowest possible price. Simultaneously, it ensures the Commercial Arm's financial statements reflect a commercially viable operation from day one, showing a healthy return on invested capital. This creates a clean financial history and a clear firewall between the public-good and commercial aspects of the operation, making the entity "bankable" and suitable for a future IPO. Private investors will be able to clearly see that they are investing in the profitable expansion into commercial markets, not subsidizing a public works project.

4.2. Australian "Virtual Gigafactory" Cost Modelling

A detailed, bottom-up cost model is essential for credible financial forecasting. This model is based on international benchmarks adapted for the Australian context and the "virtual gigafactory" or distributed network strategy.

Capital Expenditure (CapEx):

The distributed model changes the CapEx profile. Instead of a single, massive upfront investment, capital is deployed in smaller, phased tranches as regional manufacturing clusters are established and expanded. While a single mega-factory might achieve slightly better economies of scale on construction, the distributed model allows for the use of faster and cheaper "brownfield" retrofits initially, reducing early-stage capital risk.1 A conservative blended estimate of AUD $160 million per GWh of annual production capacity is used for this model, reflecting a mix of lower-cost brownfield retrofits and higher-cost greenfield facilities. This results in a total phased capital investment of approximately AUD $11.2 billion to reach the target 80 GWh capacity by 2040, fully utilizing the NEN ITF's manufacturing fund.

Operational Expenditure (OpEx):

The operating cost per unit is the most critical factor for long-term competitiveness. The following table breaks down the estimated OpEx for an Australian-made Na-ion battery pack. While a distributed network may have slightly higher overheads per unit compared to a single mega-factory, this is offset by significant savings in cross-country logistics and enhanced supply chain resilience.

Cost Component Percentage of Total OpEx (Benchmark) Estimated Australian Cost (AUD per kWh) Notes
Direct Materials 60% $45.00 The NEN's national bulk-purchasing power mitigates cost differences between factory models.1
* Cathode Materials (Prussian White/Layered Oxide) 25% $18.75 Assumes domestic processing of iron, manganese.
* Anode Materials (Hard Carbon) 15% $11.25 Initially imported, potential for domestic production from biomass.
* Electrolyte & Salt (Na-based) 5% $3.75 Secure domestic supply of sodium salts.
* Separator 5% $3.75 Imported component.
* Current Collectors (Aluminium) & Casing 10% $7.50 Strong domestic advantage with abundant bauxite/aluminium.
Direct Labor 15% $11.25 Based on Australian advanced manufacturing wage rates, offset by high automation.
Energy 10% $7.50 Based on industrial electricity rates; potential for lower costs via co-located renewables.
Plant & Equipment Depreciation 10% $7.50 Based on total CapEx over a 20-year asset life and total lifetime production.
Overheads (R&D, SG&A, etc.) 5% $3.75 Includes research, sales, general & administrative costs.
Total Estimated OpEx 100% AUD $75.00 / kWh

Source: Derived from industry cost breakdowns and Australian economic data. Costs are forward-looking estimates for scaled production (post-2030).

This model indicates a target production cost of AUD $75/kWh once at scale. This highlights that even with higher labor costs, the dominant cost driver remains materials, where Australia's domestic resource endowment and the NEN's bulk purchasing power provide significant structural advantages.

4.3. Revenue and Pricing Strategy

Profitability is contingent on a dual-pricing strategy that reflects the different markets being served.

The financial strategy is clear: the NEN contract phase is used to build the industrial asset and cover its fixed costs, effectively acting as a publicly funded incubation period. The subsequent phases, serving the profitable domestic grid and export markets, are where commercial returns are generated, driving the enterprise toward self-sufficiency.

4.4. Break-Even Analysis and Investment Projections

Integrating the aggressive, overlapping production ramp-up with the detailed cost model allows for a comprehensive financial forecast. This model projects annual cash flows and tracks the reliance on public funding from the NEN ITF.

The analysis indicates that the NEN Commercial Arm will reach its break-even point around the year 2038. This is defined as the point where cumulative free cash flow from its commercial operations (domestic grid and export sales) turns positive and is sufficient to fund its ongoing operational costs and future capital expenditure for expansion without requiring further funding draws from the NEN ITF. From this point forward, the enterprise becomes a net contributor to public funds, capable of repaying initial loans or delivering a dividend to the Commonwealth.

The following table provides a high-level summary of the projected financial path to self-sufficiency under the aggressive, distributed manufacturing model, extended to 2050.

Table 4.1: Projected Financials for NEN Commercial Arm (2026-2050, AUD Millions)

Year Production (GWh) Total Revenue (M) Total OpEx (M) EBITDA (M) CapEx (M) Free Cash Flow (M) ITF Funding (Draw) (M) Cumulative ITF Draw (M)
2026 0 0 0 0 -800 -800 800 800
2028 5 375 -375 0 -1,500 -1,500 1,500 2,300
2030 15 1,125 -1,125 0 -2,000 -2,000 2,000 4,300
2032 30 2,250 -2,250 0 -2,000 -2,000 2,000 6,300
2034 50 3,750 -3,750 0 -1,500 -1,500 1,500 7,800
2035 60 4,950 -4,500 450 -1,000 -550 550 8,350
2038 80 6,600 -6,000 600 -500 100 0 8,350
2040 90 7,425 -6,750 675 -500 175 0 8,350
2045 110 9,125 -8,250 875 -500 375 0 8,350
2050 120 9,800 -9,000 800 -500 300 0 8,350

Note: This is an illustrative model. Revenue from 2035 onwards is based on a mix of at-cost NEN supply and commercial sales for domestic and export markets. CapEx after 2037 reflects ongoing maintenance and self-funded expansion. The enterprise becomes self-sustaining from 2038, no longer requiring draws from the NEN ITF. The total cumulative draw from the NEN ITF's manufacturing component is projected to be ~$8.35 billion, well within the allocated budget of ~$11.5 billion.

Section 5: Strategic Recommendations & Risk Mitigation

To successfully execute this ambitious national project, a series of decisive policy, industrial, and commercial actions must be taken. This section outlines key recommendations and addresses the primary risks associated with the initiative, proposing specific mitigation strategies.

5.1. Policy and Governance Recommendations

5.2. Industrial and Commercial Recommendations

5.3. Key Risk Assessment & Mitigation

Works cited

  1. National Energy Network (NEN) Policy Proposal, accessed June 25, 2025
  2. AEMO says Australia's NEM will need 49GW/646GWh of dispatchable storage by 2050, accessed June 24, 2025, https://www.energy-storage.news/aemo-says-australias-nem-will-need-49gw-646gwh-of-dispatchable-storage-by-2050/
  3. 2024 Forecasting Assumptions Update - Australian Energy Regulator (AER), accessed June 25, 2025, https://www.aer.gov.au/system/files/2024-08/AEMO%20-%202024%20Forecasting%20Assumptions%20update%20-%20August%202024.pdf
  4. All The Factors Behind Li-ion Battery Prices - LOHUM, accessed June 25, 2025, https://lohum.com/media/blog/guide-to-lithium-ion-battery-prices-in-the-market/
  5. Sodium-ion: The Battery Built for Trade Resilience | IDTechEx Research Article, accessed June 24, 2025, https://www.idtechex.com/en/research-article/sodium-ion-the-battery-built-for-trade-resilience/33140
  6. Assessing the Future of Sodium-Ion Battery Technologies - Exponent, accessed June 24, 2025, https://www.exponent.com/article/assessing-future-sodium-ion-battery-technologies
  7. Japan's Shift from Lithium to Sodium Batteries: A Strategic Pivot in Energy Storage and Supply Chain Resilience - TRENDS Research & Advisory, accessed June 24, 2025, https://trendsresearch.org/insight/japans-shift-from-lithium-to-sodium-batteries-a-strategic-pivot-in-energy-storage-and-supply-chain-resilience/
  8. A new era for batteries: Argonne leads $50M sodium-ion innovation push, accessed June 24, 2025, https://www.anl.gov/article/a-new-era-for-batteries-argonne-leads-50m-sodiumion-innovation-push
  9. Sodium-Ion Batteries: Commercial Potential and Future Possibilities - SodiumBatteryHub, accessed June 24, 2025, https://sodiumbatteryhub.com/2025/04/09/sodium-ion-batteries-commercial-potential-and-future-possibilities/
  10. Techno-economics Analysis on Sodium-Ion Batteries: Overview and Prospective, accessed June 24, 2025, https://www.researchgate.net/publication/377998334_Techno-economics_Analysis_on_Sodium-Ion_Batteries_Overview_and_Prospective
  11. Gigafactory Nevada - Wikipedia, accessed June 25, 2025, https://en.wikipedia.org/wiki/Gigafactory_Nevada
  12. Natron Energy Announces Plans for $1.4 Billion Giga-Scale Sodium-Ion Battery Manufacturing Facility in North Carolina - Business Wire, accessed June 24, 2025, https://www.businesswire.com/news/home/20240815622233/en/Natron-Energy-Announces-Plans-for-%241.4-Billion-Giga-Scale-Sodium-Ion-Battery-Manufacturing-Facility-in-North-Carolina
  13. Battery gigafactory capex costs? - Thunder Said Energy, accessed June 24, 2025, https://thundersaidenergy.com/downloads/battery-gigafactory-capex-costs/
  14. Decoding Gigafactories: The future of electric vehicles | Beck & Pollitzer, accessed June 25, 2025, https://beck-pollitzer.com/decoding-gigafactories-the-future-of-electric-vehicles/
  15. How the world's biggest EV battery gigafactories are being built so quickly, accessed June 24, 2025, https://www.constructionbriefing.com/news/how-the-worlds-biggest-ev-battery-gigafactories-are-being-built-so-quickly/8030551.article
  16. Volkswagen-backed PowerCo SE reaches significant milestone in St. Thomas gigafactory project, accessed June 24, 2025, https://www.volkswagen-group.com/en/press-releases/volkswagen-backed-powerco-se-reaches-significant-milestone-in-st-thomas-gigafactory-project-17962
  17. Timeline: Tesla's Construction of Gigafactories - Manufacturing Digital, accessed June 24, 2025, https://manufacturingdigital.com/digital-factory/timeline-teslas-construction-gigafactories
  18. Gigafactory Berlin-Brandenburg - Wikipedia, accessed June 24, 2025, https://en.wikipedia.org/wiki/Gigafactory_Berlin-Brandenburg
  19. CATL Gigafactory Project Expected to Begin Production in August - Energytrend, accessed June 24, 2025, https://www.energytrend.com/news/20250304-49094.html
  20. (PDF) Critically assessing sodium-ion technology roadmaps and scenarios for techno-economic competitiveness against lithium-ion batteries - ResearchGate, accessed June 24, 2025, https://www.researchgate.net/publication/387976757_Critically_assessing_sodium-ion_technology_roadmaps_and_scenarios_for_techno-economic_competitiveness_against_lithium-ion_batteries
  21. How gigafactory construction is happening at lightning speed - Autodesk, accessed June 24, 2025, https://www.autodesk.com/design-make/articles/gigafactory-construction
  22. Forge Battery Completes Contract Negotiation to Secure $100M from U.S. Department of Energy for North Carolina Lithium-Ion Battery Gigafactory, accessed June 25, 2025, https://forgebattery.com/2025/01/forge-battery-completes-contract-negotiation-to-secure-100m-from-u-s-department-of-energy-for-north-carolina-lithium-ion-battery-gigafactory/
  23. AEMO 2024 Integrated System Plan (ISP) - Australian Energy ..., accessed June 24, 2025, https://aemo.com.au/-/media/files/major-publications/isp/2024/2024-integrated-system-plan-isp.pdf?la=en
  24. Australian Energy Market Operator RE: Draft 2024 ISP Consultation Thank you for the opportunity for the I - IEEFA, accessed June 25, 2025, https://ieefa.org/media/4322/download
  25. 2023 - 24 inputs, assumptions and scenarios - AEMO, accessed June 24, 2025, https://aemo.com.au/energy-systems/major-publications/integrated-system-plan-isp/2024-integrated-system-plan-isp/current-inputs-assumptions-and-scenarios
  26. 2024 Integrated System Plan – overview - Australian Energy Market Operator, accessed June 25, 2025, https://aemo.com.au/-/media/files/major-publications/isp/2024/2024-integrated-system-plan-overview.pdf?la=en
  27. Sodium-ion Batteries 2025-2035: Technology, Players, Markets, and Forecasts - IDTechEx, accessed June 24, 2025, https://www.idtechex.com/en/research-report/sodium-ion-batteries-2025-2035-technology-players-markets-and-forecasts/1082
  28. Sodium-ion Batteries: The Lithium Alternative Poised to Break $30 Billion by 2036 - AInvest, accessed June 24, 2025, https://www.ainvest.com/news/sodium-ion-batteries-lithium-alternative-poised-break-30-billion-2036-2506/
  29. Global Market for Sodium-ion Batteries 2026-2036: - GlobeNewswire, accessed June 24, 2025, https://www.globenewswire.com/news-release/2025/06/19/3102081/0/en/Global-Market-for-Sodium-ion-Batteries-2026-2036-Sodium-Ion-Battery-Market-to-Surpass-30B-by-2036-Disrupting-Lithium-Dominance.html
  30. Powering through: how EV battery producers can beat the cost crunch | Kearney, accessed June 24, 2025, https://www.kearney.com/industry/automotive/article/powering-through-how-ev-battery-producers-can-beat-the-cost-crunch
  31. $300 billion in new lithium ion battery gigafactories - EVBoosters, accessed June 25, 2025, https://evboosters.com/ev-charging-news/300-billion-in-new-lithium-ion-battery-gigafactories/
  32. Cost Analysis of a Sodium-ion Battery Pack for Energy and Power Applications using Combined Multi-physics and Techno-Economic Modeling, accessed June 24, 2025, https://www.cetjournal.it/cet/22/94/023.pdf
  33. R&D and innovation in Australia: 2024 update, accessed June 25, 2025, https://www.aph.gov.au/About_Parliament/Parliamentary_departments/Parliamentary_Library/Research/Research_Papers/2024-25/RandD_and_innovation_in_Australia_2024_update
  34. Manufacturing - CSIRO, accessed June 25, 2025, https://www.csiro.au/en/work-with-us/industries/manufacturing
  35. Sodium-ion Battery Market Size, Growth Trends & Industry Forecast, 2030, accessed June 24, 2025, https://www.mordorintelligence.com/industry-reports/sodium-ion-battery-market
  36. UK electric vehicle and battery production potential to 2040 - The Faraday Institution, accessed June 24, 2025, https://www.faraday.ac.uk/wp-content/uploads/2024/09/Gigafactory-Report_2024_final_17Sept2024.pdf
  37. Eligible expenditure under the R&D tax incentive | Australian Taxation Office, accessed June 25, 2025, https://www.ato.gov.au/businesses-and-organisations/income-deductions-and-concessions/incentives-and-concessions/research-and-development-tax-incentive-and-concessions/research-and-development-tax-incentive/previous-years/guides/amounts-you-can-claim/eligible-expenditure-under-the-rd-tax-incentive
  38. 2024 ISP Market Model Instructions - Australian Energy Market Operator, accessed June 24, 2025, https://aemo.com.au/-/media/files/major-publications/isp/2024/supporting-materials/2024-isp-plexos-model-instructions.pdf?la=en
  39. 2024 Integrated System Plan (ISP) - AEMO, accessed June 25, 2025, https://aemo.com.au/energy-systems/major-publications/integrated-system-plan-isp/2024-integrated-system-plan-isp
  40. Draft 2024 ISP Consultation - AEMO, accessed June 25, 2025, https://aemo.com.au/consultations/current-and-closed-consultations/draft-2024-isp-consultation
  41. Smart grids - IEA, accessed June 25, 2025, https://www.iea.org/energy-system/electricity/smart-grids